Construction of export route for crude oil from the Sangachal Terminal in Azerbaijan to the Black Sea loading terminal at Supsa in Georgia
Length: 748 m, 945 m, 1,291 m
Western Route Export Pipeline Project
Execution of five river crossings for the installation of a 48" pipe using the HDD method. Lengths: 645 m, 703 m, 867 m, 964 m, 616 m
Project report SCPX
Crossing of landscape protected area with two 350 t HDD rigs
Lengths: 1,716 m, 1,663 m, 1,528 m
Diameter: well 48“, pipe DN 900
Project report Jemgum
Connection between offshore drilling platform Mittelplate and onshore facility with five HDD rigs
Lengths: 15,000 m; 6 sections; Diameter: 10“, 6“
Project report Mittelplate
Shore crossing for installation of 16’’ gas pipeline
Length: 2,100 m
Pipe construction and commissioning
Project report Devil Creek Development
Three crossings by microtunneling method
Lengths: 170 m, 114 m, 86 m; 56“ steel casing for 46“ oil pipeline
First microtunneling project for Petrobras
Project report Oleoduto RNEST
Crossing of "Strait of Hormuz“ between Iranian mainland and island Qeshm for installation of 16“ product pipe as connection line
Length: 3,060 m
Project report Qeshm Island
Dune crossing
Lengths: 2 x 890 m
Diameter: 20“, 30“
Project report Macedon Field Development