The drilling rig VDD 370.3 Synergy 2 has been disassembled, loaded and transported since 23rd March 2019.
NAM will continue to control the site and perform gas-free measurements until the drilling location can finally be handed over to the local community.
For DrillTec, the drilling location in the centre of the village was an interesting and challenging project, but one that could be completed to the satisfaction of all parties involved.